The engineer came by to check the rebar work. They completed it today and he said it was good work, clean and dry. He had them adjust the level of the rebar by the entry into the garage. They had a brick under the rebar and he wanted it turned on its face so the rebar would sit lower.
The men were done by noon and the inspector came shortly after. The city inspector was supposed to show up as well. He had not when I left the house